top of page

Registration

June 01, 2025

Install solar or wind generation equipment in a 30% to 70% ratio without any upfront payments

70-30-pie-chart.png
pngtree-non-fungible-token-logo-design-nft-icon-gradient-hexagonal-png-image_6005258.png.p
pngtree-non-fungible-token-logo-design-nft-icon-gradient-hexagonal-png-image_6005258.png.p
pngtree-non-fungible-token-logo-design-nft-icon-gradient-hexagonal-png-image_6005258.png.p
pngtree-non-fungible-token-logo-design-nft-icon-gradient-hexagonal-png-image_6005258.png.p
70-30-pie-chart.png

We will install 30% of the equipment kit on your land or rooftop as a 'Rental Payment' for a period from 15 years, while retaining the remaining 70% of the equipment kit to ensure financial coverage for every 'green' kilowatt (NFT) in countries with tariffs below 0.12 ($/€/£). You can pay for all installation expenses in kilowatts (NFT) from your 'Rental Payment' after the equipment installation, within 48 months. A unified sales rate for energy resources, regardless of jurisdiction, allows for greater income and introduces NFT as payment for goods and services without conversion losses. Now you can become a generating participant in the national energy market and also create a business from the offerings in the "Lego Energy" section, managing our 70% of energy.

 

The SEG Program voluntarily executes projects of homeowners and landowners ("SEG Program Generators") who wish to install solar, wind, or hydrogeneration equipment WITHOUT ADVANCE PAYMENTS in a manner that generates a steady income from 3,000 ($/€/£) to 297,000 ($/€/£) per year. Check the location of your land plot or roof in the required area, and also 'stake out' your place in line to receive the equipment set faster than others!

giphy4.gif
Без заголовка1.png

Choose a Package suitable for your area, and check the solar, wind, or hydro efficiency coefficient: for solar generation, the location coefficient of your property should be no less than 1,300/ 1,400, for wind generation - no less than 3,000, for hydro generation - from 6,000. 

To install SEG Program equipment, you only need a roof or a piece of land. Contact the Generating Company SPPG in your country to install equipment or ask questions.

The project does not require any advance payments!

Add an Application 

Strategies with Financial Resources / Nation's Cooperation

Choose the equipment set and order its installation!

The Program SEG offers autonomous and optimized provisions for global deployment of clean energy, utilization of new revenue sources, and functioning as a "seamless global energy ecosystem," thereby contributing to increased efficiency for future applications. You can sell the energy at a unified tariff, regardless of jurisdiction or above our tariff.

 

Additionally, you will be able to consume the energy from the "Rental Payment" for free. Accept the deal for the required amount for a term of 6, 12, 24, or 36 months at a fixed rate, regardless of jurisdiction and pay for what your "energy wallet" allows. After the transaction, income from your energy will return back to you.

 

• 1 kW = 150.00 ($/€/£) / 6 months

• 1 kW = 300.00 ($/€/£) / 12 months

• 1 kW = 600.00 ($/€/£) / 24 months

• 1 kW = 900.00 ($/€/£) / 36 months

Registration

June 01, 2025

Small Capacities:

Private individuals/ Households / Solar generation:

Lease agreement for 15 years:

 

Registration

June 01, 2025

Roofs and Land Plots 

Provide a roof or land plot for the installation of SEG Program equipment and receive your kilowatts (NFT) as an "energy" wallet and a new source of income. In addition, we will pay you! Connect to the SEG Program App service to become a participant of the global virtual power station, interacting directly with each other without intermediaries! 

Solar-panel-leasing.jpg
TELEMMGLPICT000355949836_16994477063880_trans_NvBQzQNjv4BqpVlberWd9EgFPZtcLiMQf0Rf_Wk3V23H
1700131412_26247_(1).jpg
Ecomm.gif
697ae01519e8c969606e0b0eea382cbe-swipe-right-gesture-icon.png.webp
697ae01519e8c969606e0b0eea382cbe-swipe-right-gesture-icon.png.webp
697ae01519e8c969606e0b0eea382cbe-swipe-right-gesture-icon.png.webp
697ae01519e8c969606e0b0eea382cbe-swipe-right-gesture-icon.png.webp
697ae01519e8c969606e0b0eea382cbe-swipe-right-gesture-icon.png.webp
697ae01519e8c969606e0b0eea382cbe-swipe-right-gesture-icon.png.webp
legos-in-png-8.png
1712337713958.jpeg
697ae01519e8c969606e0b0eea382cbe-swipe-right-gesture-icon.png.webp

Registration

June 01, 2025

Install SEG Program equipment.

'Green' energy 'wallets' on land plots and rooftops.

Households

From 35 kW to 100 kW

Legal entities

From 35 kW to 3,3 MW

Land plotand 

From 35 kW to 3,3 MW

Choose a Package suitable for your area, and check the solar, wind, or hydro efficiency coefficient: for solar generation, the location coefficient of your property should be no less than 1,400, for wind generation - no less than 3,000, for hydro generation - from 6,000.  The required area for installing equipment on your land or roof is from 220 square meters.

To install SEG Program equipment, you only need a roof or a piece of land.

The project does not require any advance payments!

Homeownership

Individuals

Select the SEG Program Package from 35 kW to 100 kW, provided that your roof or land plot is over 220 square meters. Solar generation equipment is installed on plots and roofs with a coefficient of at least 1,400. Please check the location of your property before submitting your application. The distance to the connection point to the grid should not exceed 3,000 m (for land plots).

Без заголовка121.jpg

Roof with slope

Без заголовка134.jpg

Flat roof

Без заголовка097.jpg

Land plot

Land plot
Solar

Individuals/ Legal entities

Select the SEG Program Package from 100 kW to 3,300 kW, provided that your land plot is over 650 square meters. Solar generation equipment is installed on plots with a coefficient of at least 1,400. Please check the location of your property before submitting your application. The distance to the connection point to the grid should not exceed 3,000 m (for land plots).

Flat roof

Legal entities

Select the SEG Program Package from 100 kW, provided that your flat roof is over 650 square meters. Solar generation equipment is installed on roofs with a coefficient of at least 1,400. Please check the location of your property before submitting your application. The distance to the connection point to the grid should not exceed 3,000 m (for land plots).

Flat roof

Legal entities

Select the SEG Program Package from 100 kW, provided that your land plot is over 500 square meters. Solar generation equipment is installed on plots with a coefficient of at least 3,000. Please check the location of your property before submitting your application. The distance to the connection point to the grid should not exceed 3,000 m (for land plots).

резервуар

Registration

June 01, 2025

Small hydro power plants

Legal entities

An "Investment Agreement with a right of share buyback" Program

Construction of small hydro-energy from 1 MW to 5 MW in accordance with the "Investment Agreement with a Right of Share Buyback" Program at a rate of 1,450 ($/€/£) per kW for turnkey solar stations. VAT is not included. Commission - 1%. To participate in the Program, you need to have a stake in the station's cost ranging from 5% to 30% of the project's cost in the form of a letter of credit.

 

To participate in the program, you need to have permission for the construction of a hydroelectric power station and a sufficient water load coefficient of more than 1,000 (refer to the "Flow (m³/s)" indicator or a flow height (m) of at least 10 meters). Before submitting your application, please verify the location of your real estate property. The distance to the grid connection point should not exceed 3,000 meters (for land plots).

Europa

Asia

Registration

June 01, 2025

Round at 10 kW

Individuals/ Legal entities

To buy a Round in a Public Solar or Wind Farm

The energy farm allows selling a portion of solar power to third parties who are unable to install SEG Program Packages but wish to participate in the SEG Program. By purchasing a Round, you can become a partial owner of SEG assets remotely and benefit from your kilowatts according to the SEG standard. It can definitely be advantageous!

 

Buying a Round grants ownership rights to a share of the overall equipment Package. One Round — from 10 kW—can generate an annual income of up to 3,000.00 ($/€/£) in just 36 hours. The system offers Rounds for 10 kW, 15 kW, and 30 kW. Participants who collect all three Rounds are eligible for the "Happy People" Program. The cost per kW in a Round is 1,500 ($/€/£). VAT is not included. Commission is 1%.

Ферма солнечных батарей8

Registration

June 01, 2025

Round at 30 kW

Individuals/ Legal entities

To buy a Round in a Public Solar or Wind Farm

The energy farm allows selling a portion of solar power to third parties who are unable to install SEG Program Packages but wish to participate in the SEG Program. By purchasing a Round, you can become a partial owner of SEG assets remotely and benefit from your kilowatts according to the SEG standard. It can definitely be advantageous!

 

Buying a Round grants ownership rights to a share of the overall equipment Package. One Round — from 30 kW—can generate an annual income of up to 9,000.00 ($/€/£) in just 36 hours. The system offers Rounds for 10 kW, 15 kW, and 30 kW. Participants who collect all three Rounds are eligible for the "Happy People" Program. The cost per kW in a Round is 1,500 ($/€/£). VAT is not included. Commission is 1%.

Become a participant of the SEG Program

1 "green" kilowatt in NFT (stablecoin) = 1 kW of installed equipment under the SEG Program, not kW-hour! Artificial Intelligence ensures the execution of anonymous requests based on the principle: 5 donor countries (SEG tariff above 0.12 ($/€/£))/ 2 recipient countries (SEG tariff above 0.12 ($/€/£). 1 "green" kilowatt in NFT can be converted to ($/€/£) at the SEG rate or used for payments in kW, without loss due to conversion, based on the following: 

• 1 kW = 150.00 ($/€/£) / 6 months                                                  

• 1 kW = 300.00 ($/€/£) / 12 months                                               

• 1 kW = 600.00 ($/€/£) / 24 months                                                  

• 1 kW = 900.00 ($/€/£) / 36 months

• ($/ kW) / For all countries outside the EU and the UK.

• (€/ KW)/ For EU countries. 

• (£/ KW)/ For the UK.

Install equipment under the SEG Program

giphy4.gif

Which equipment set would be suitable for me?

pngtree-non-fungible-token-logo-design-nft-icon-gradient-hexagonal-png-image_6005258.png.p

How can I use the income from energy production?

We offer everyone access to "green" energy resources without imposing a financial burden on the budgets of citizens and governments. To install SEG Program equipment, you only need a roof or a piece of land.

The project does not require any advance payments!

Strategies with Financial Resources / Nation's Cooperation

697ae01519e8c969606e0b0eea382cbe-swipe-right-gesture-icon.png.webp

Strategic Projects by NEBU Open for All to Participate!

The "Trust" Program 

1. Our own Projects, where everyone can participate:

  1. ECO System Building Group

  2. ECO System Technopark Group 

  3. Energy Program SEG

  4. EVs virtual power plants

  5. Global Logistics Service CLASSO

  6. Conference "Nation's Green Energy"

  7. Tennia Academy TAGE

  8. "I + 15,000.00 ($/€/£/n) + master class"

  9. Ge-Pass (Booking Service)

  10. Insurance and "Reverse" insurance

  11. DPW Fund/ "Smart Bench"

2. Projects to which we attract participants of the 'Trust' Program:

The NEBU-Job Service:

  • Consulting with NEBU

  • Nation's Control

  • Repair with EPCG

  • Project "Repair with EPCG" / License

  • Project "Repair with EPCG" / Franchise

  • "Designer funded by EPCG" / License

  • Online Service Payment Cabinet

  • Telemedicine / Medservice NEBU (Medical Insurance) / License

  • Telemedicine / License

3. Simple Solutions of the "Trust" Program

4. Complex Solutions of the 'Trust' Program

5. The "Helpers" Service

 

Personal Page / Personal Account

NEBU-Speak

Nation's Cooperation

  • Personal Page / Personal Account​

  • Portfolio

Directions and Industries: 

  • Production and Processing
  • Public Catering

  • Infrastructure and Urban Planning

  • Agriculture

  • Vertical Farming

  • Forestry

  • Transportation

  • Communication

  • Services and Utilities

  • Science

  • Education

  • IT Technologies

  • Payments and Transfers

  • Commodity-Energy Crypto Exchange (CECE)

  • Investment

  • "The Evaluation" Service/ Receive 15,000 ($/€/£) in exchange for a 10% stake in the project

  • Start-ups + TOP-10 

  • TOP-10

  • TOP-10 + TOP-10= TOP-10

  • In a Row 

  • NEBU-Job

  • Consulting NEBU

  • Insurance

  • Insurance & "Reverse" Insurance

  • Medical and Health Insurance (Voluntary Health Insurance)

  • Pension Insurance (non-governmental funds)

  • Employers and Employees

  • Freelancing

  • Online Cabinet for Paid Services

  • Property Management Companies

  • Cooperatives (barter, CEX Exchange)

  • Collaborative Business Leadership

  • Farmers

  • Construction and Development

  • Real Estate

  • Plots of Land

  • My Home

  • "The Smart Home" Project

  • Expense Optimization

  • Business

  • B2B2C Catalog

  • Representation and Sales Support

  • Redevelopment and Unfinished Construction

  • Safety and Control

  • Innovation

  • Green Technoparks

  • Green Energy

  • Recycling

  • SEG Energy Program

  • CLASSO Global Logistics Service

  • Trade

  • Online Stores

  • Delivery

  • Implementation with an Investment Package

  • Additional Income

  • Creativity and Empathy

  • "Smart Bench"

  • Culture

  • Art

  • Information / Media

  • Events

  • Entertainment Industry

  • Reality

  • Society

  • Travel, Tourism, Leisure

  • Service for travelers Ge-Pass

  • Sports

  • Loyalty Programs

  • Programs for Non-Residents

  • NEBU Programs

  • Enhance NEBU

  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • TikTok

© 2024 The website is under editing due to the expansion of the holding. 

All projects are in the organization and software testing phase until November 1, 2025.

London office/ GDB INVESTMENT GROUP LIMITED: 71–75 Shelton Street, Covent Garden, London, WC2H 9JQ.

London office/ SEG Energy Leasing: 167-169 Great Portland Street, 5th Floor, London, United Kingdom, W1W 5PF. 

London office/ ECO SYSTEM BUILDING GROUP LIMITED: 85 Great Portland Street, First Floor, London, England, W1W 7LT.

Finland/ Estonia office/ GDB Wind Park Oy: BC ASSI Valtakatu 49-51 53100 Lappeenranta, Finland.

bottom of page